Reference guide · EMT conduit bending marks

Conduit bending offset chart in metric: multipliers and shrink in mm

By the Mirage Interactive team · Last checked

An offset moves conduit sideways by a set height, using two bends of the same angle. The two bend marks are one travel apart, and the conduit loses a little length, called shrink. Most charts are in inches. This one is in millimetres for the conduit and bender you use in metric.

The multipliers are exact, not rounded to trade values. The travel multiplier is the cosecant of the bend angle: multiply the offset height by it to get the distance between the two marks. Shrink is what you add to the cut length to make up for the bends.

The short answer

Distance between the marks = offset height x travel multiplier. At 30 degrees the multiplier is 2.0000, at 45 degrees it is 1.4142 and at 22.5 degrees it is 2.6131.

Shrink = offset height x tan(angle / 2). A 75 mm offset at 30 degrees has marks 150.0 mm apart and loses 20.1 mm.

Tables

The first table gives the multipliers and the shrink per 100 mm of offset for common bend angles. The second gives the distance between the two marks in millimetres, by offset height and angle. The third gives the shrink in millimetres. Use your browser's print command to print this page: the tables print without the navigation.

Offset multipliers by bend angle, with shrink per 100 mm of offset
Bend angle (deg)Travel multiplierRun multiplierShrink per 100 mm of offset (mm)
105.75885.67138.75
22.52.61312.414219.89
302.00001.732126.79
451.41421.000041.42
601.15470.577457.74

Source: computed by the site build from the formulas below.

Distance between the two bend marks (mm), by offset height and bend angle
Offset height (mm)10 deg22.5 deg30 deg45 deg
25144.065.350.035.4
40230.4104.580.056.6
50287.9130.7100.070.7
75431.9196.0150.0106.1
100575.9261.3200.0141.4
150863.8392.0300.0212.1
2001151.8522.6400.0282.8
2501439.7653.3500.0353.6
3001727.6783.9600.0424.3

Source: computed by the site build from the formulas below.

Shrink (mm) to add to the length, by offset height and bend angle
Offset height (mm)10 deg22.5 deg30 deg45 deg
252.25.06.710.4
403.58.010.716.6
504.49.913.420.7
756.614.920.131.1
1008.719.926.841.4
15013.129.840.262.1
20017.539.853.682.8
25021.949.767.0103.6
30026.259.780.4124.3

Source: computed by the site build from the formulas below.

Formulas

Travel (distance between marks)
travel = height / sin(angle)
The multiplier 1 / sin(angle) is the cosecant of the bend angle.
Run and shrink
run = height / tan(angle) shrink = travel - run = height x tan(angle / 2)
The run is the length the offset covers along the line of the conduit. Shrink is the difference between the travel and the run.
Check
travel^2 = height^2 + run^2
The offset is a right triangle: use this to check a chart or a number you were given.

Worked example

A 75 mm offset at 30 degrees, then at 22.5 degrees

  1. At 30 degrees the travel multiplier is 2, so the marks are 75 x 2 = 150.0 mm apart.
  2. Shrink is 75 x tan 15 = 20.1 mm. Add that to the length you cut.
  3. At 22.5 degrees the multiplier is 2.6131, so the marks are 196.0 mm apart and the shrink is 14.9 mm.
  4. Mark the conduit at the first mark and at the second, line each mark up with the reference of your bender, and bend both to the chosen angle in opposite directions.

Things to watch

  • The marks are measured on the conduit from one end. Which reference of your bender you line each mark up with depends on your tool, so use your own bender values.
  • Bend one piece of scrap first and check it against the obstacle before you bend the run. Trade charts round the multipliers, so your own chart may differ by a millimetre or two.
  • This page gives geometry only. It does not say a layout meets any electrical code.

Related guide: Conduit bending multipliers and offset chart

More from this family: 3-point and 4-point saddle bend calculator · Conduit rolling offset calculator: marks, shrink and roll angle · 90 degree stub-up in conduit: take-up chart and back-to-back marks · Voltage drop calculator: drop in volts and percent for a copper or aluminium run · Wire size calculator: AWG sizes and the smallest size for a voltage drop target

Skip the arithmetic

Conduit Bending & Offset Marks

Conduit Bending & Offset Marks gives numbered marks to tape on the conduit for offsets, rolling offsets, saddles, kicks and 90 stubs, with your own bender's take-up and gain. One-time purchase · No subscription · Price shown in your store. Works offline, no ads, no account.

Questions

What is the multiplier for a 30 degree offset?

Exactly 2. The marks are twice the offset height apart, and the shrink is 0.268 times the height.

Why does a metric chart differ from an inch chart?

It does not, apart from the unit. The multipliers are ratios, so the same numbers apply in millimetres and inches. Only the offset height and the distances change.

Do I add the shrink or take it off?

Add it to the length you cut, because the two bends use up conduit length.