A saddle bend takes conduit over an obstacle, such as a pipe, a beam or a duct, and brings it back to the same line on the other side. A 3-point saddle uses one centre bend and two outer bends. A 4-point saddle uses four bends and suits a wide obstacle, because the conduit runs level across the top.

Both are built from offsets. The outer marks are one offset travel away from the centre, and the shrink is what the conduit loses in length. This guide gives the exact geometric values, not rounded trade multipliers, so a small difference from a rule-of-thumb chart is expected.

The short answer

3-point saddle: mark the centre of the obstacle, measure one travel either side and bend the centre mark at twice the angle of the outer marks. With 22.5 degree outer bends the travel is 2.613 times the obstacle height; with 30 degree outer bends it is exactly 2 times.

Shrink is the length the conduit loses, so add it to the length you cut. It grows in direct proportion to the height: 0.398 times the height for 22.5/45, and 0.536 times for 30/60.

Tables

Obstacle height in inches against the distance from the centre mark to each outer mark, and the total shrink. The fractions are rounded to the nearest 1/16 inch. Use your browser's print command to print this page: the tables print without the navigation.

3-point saddle: outer mark distance from the centre mark and total shrink, in inches
Obstacle height (in)22.5/45: mark distance22.5/45: shrink30/60: mark distance30/60: shrink
12.61 (2 5/8)0.3982.00 (2)0.536
25.23 (5 1/4)0.7964.00 (4)1.072
37.84 (7 13/16)1.1936.00 (6)1.608
410.45 (10 7/16)1.5918.00 (8)2.144
513.07 (13 1/16)1.98910.00 (10)2.679
615.68 (15 11/16)2.38712.00 (12)3.215

Source: computed by the site build from the formulas below.

4-point saddle: distance between the marks of each offset, and total shrink, in inches
Obstacle height (in)22.5: mark gap22.5: shrink30: mark gap30: shrink45: mark gap45: shrink
12.610.3982.000.5361.410.828
25.230.7964.001.0722.831.657
37.841.1936.001.6084.242.485
410.451.5918.002.1445.663.314
513.071.98910.002.6797.074.142
615.682.38712.003.2158.494.971

Source: computed by the site build from the formulas below.

Formulas

Offset travel, run and shrink
travel = height / sin(angle) run = height / tan(angle) shrink = travel - run
Shrink is also height x (cosec - cot) of the angle, which equals height x tan(angle / 2).
3-point saddle
outer mark distance = height / sin(outer angle) centre bend = 2 x outer angle shrink = 2 x height x tan(outer angle / 2)
Two offsets of the same height share the centre bend, so the shrink is twice that of one offset.
4-point saddle
marks at 0, T, T + W, 2T + W T = height / sin(angle) shrink = 2 x height x tan(angle / 2)
W is the level distance across the top, measured between the two middle marks. All four bends use the same angle.

Worked example

Conduit over a 2 inch pipe

  1. A 2 inch pipe has an outside diameter of 2.375 inches, so take the obstacle height as 2.375 inches. Add any clearance you want on top.
  2. With 22.5 degree outer bends, each outer mark is 2.375 / sin 22.5 = 6.21 inches (6 3/16) from the centre mark.
  3. The pipe centre is 24 inches from the end of the conduit. In order from the end the marks are 17.79, 24 and 30.21 inches. The outer marks take 22.5 degrees and the centre mark takes 45 degrees, bent the other way.
  4. Shrink is 2 x 2.375 x tan 11.25 = 0.945 inches, so cut the conduit that much longer.
  5. For a 4-point saddle at 45 degrees over the same height and a 10 inch wide obstacle, the marks are 0.00, 3.36, 13.36, 16.72 inches, and the shrink is 1.968 inches.

Things to watch

  • Marks are measured on the conduit from one end, and the bender reference you line each mark up with depends on your bender. Use your own bender values.
  • Bend one piece of scrap first and check it against the obstacle before you bend the run. Trade charts round the multipliers, so check results against your own charts and your own bender.
  • This page gives geometry only. It does not say a layout meets any electrical code.

Related guide: Conduit bending multipliers and offset chart

More from this family: Conduit bending offset chart in metric: multipliers and shrink in mm · Conduit rolling offset calculator: marks, shrink and roll angle · 90 degree stub-up in conduit: take-up chart and back-to-back marks · Voltage drop calculator: drop in volts and percent for a copper or aluminium run · Wire size calculator: AWG sizes and the smallest size for a voltage drop target

Skip the arithmetic

Conduit Bending & Offset Marks

Conduit Bending & Offset Marks does 3-point and 4-point saddles with your own bender take-up and gain, and lists the marks in order, measured from the end of the conduit, with the shrink you will lose. One-time purchase · No subscription · Price shown in your store. Works offline, no ads, no account.

Questions

Why 2.5 times the height for a 3-point saddle?

It is the trade rounding of 2.613, which is 1 / sin 22.5 degrees. The table shows both the exact value and a fraction to the nearest 1/16 inch.

What is the difference between a 3-point and a 4-point saddle?

A 3-point saddle makes one peak over the obstacle. A 4-point saddle makes a level run across the top, so it suits wide obstacles.

Do I add shrink or subtract it?

Add it to the length you cut, because the bends use up conduit length.